depth400m hydraulic water well drilling rig machine

depth400m hydraulic water well drilling rig machine

BZCY600CJHWwater well drilling machines is truck-mounted rotary drilling rig. The drilling rig adopts the chassis of SINOTRUK 8x4 special vehicle. Product parameters: Feature of drilling rig More speed grade,Max.torque is up to 8000N.m. Large spindle,powerful drilling capacity,high efficiency....

Product Details

BZCY600CJHWwater well drilling machines is truck-mounted rotary drilling rig. The drilling rig adopts the chassis of SINOTRUK 8x4 special vehicle.

Product parameters:

Parameter

Drill depth

600(m)

Drill rod

89mm (3-1/2”)

Winch capacity

Main hook lifting capacity kN

300

Tool winch lifting capacitykN

20

Max- rope speed of main winchm/min

70

Max- rope speed of tool winchm/min

30

Hydraulic cylinder

Lifting capacity20Mpa)(kN

245

Feeding capacity10Mpa)(kN

59

Rotary table

Inner diameter mm

500

Rotate speed rpm

9676442412

Max-torquekN.m

35

Mast

Heightmm

11800

Rated loadt

36

Drill tool

Kellymm

108*108*7500

Drill rodmm

89*6000

Mud pump

Displacement1000L/min

Pressure 5 Mpa

Diesel engine

Cummins 6BT5.9-C180

132KW/2200rpm

Transportation size

L)*(W)*(H) mm

13000*2500*4200

Feature of drilling rig

More speed grade,Max.torque is up to 8000N.m.

Large spindle,powerful drilling capacity,high efficiency.

Good dismountability,light weight,move easily.

Equipped with a water brake for steady and smooth deep hole drilling.

With low center of gravity and long traveling distance,much more reliable and stable.

With an antivibration meter,easy to know the condition in the hole.

601J

Our services

1.Any inquiries will be replied within 12 hours.

2.Professional manufacturer, Welcome to visit our factory at any time.

3.High quality, fashion designs, reasonable & competitive price and fast lead time.

4. Protection of your sales area, ideas of design and all your private information.

FAQ:

1.Q: Are you a manufacturer?

A: Yes, we are a professional rotary drilling rig manufacturer.

2.Q: What does your company produce?

A: The main products of our company include rotary drilling rig.

3.Q: How about your delivery time?

A: Normally the delivery time is about 7-15 days. For some specialcase, we can make it within 2 weeks, it depends on different products.

4.Q: What methods of payment do you accept?

A: We accept T/T

5.Q: Do you offer any deals or discounts?

A: Yes, price depends on different quantity, different quantity will give you different price.

Turn-around machine
Large rotary torque, the structure of newly designed planetary reduction box is more
compact than that of straight-tooth type
reducer with greater reduction ratio, more efficient torque moment transmission, and
more smooth operation. It doesn't need additional parts such as damping joint for shock absorption. The failure rate is lower which reduced routine maintenance cost, The unconsolidated layer is not easily sticking, high pore-forming rate.
The imported rotary sealing parts own excellent sealing and service life. Macromolecule liner is wearable and more Convenient, no need for oil injection. Manganese steel equipped with sideway
sideway free from abrasion.
★ Maintenance-free propulsion mechanism Double locked hydraulic machinery not justguaranteed the stable high torque output of hydraulic motor, its service life also greatly
extended compared with worm and gear. Themechanical lock completely eradicates internal
leakage of hydraulic pressure, meanwhile
Prevents the glide, the combination of two factors guaranteed the performance on the largest scale.Belongs to a new generation of products, itapplied more advanced technology, the propulsion mechanism doesn't need routine oi

How to improve the production efficiency of hydraulic water drilling rigs?

1. After the drill bit of the hydraulic water well drilling rig is drilled into the structure, the center drilling tool needs to be replaced in time. First, you need to clean the bottom of the hole and then blow off the residue at the bottom of the hole. After the drill bit stops rotating, the drill bit in the hydraulic water well drilling rig is drilled. It is most suitable when the lifting force is slowly increased and the lifting force is just enough to lift the drill bit.

2. The drilling process summarizes the drill bits of the hydraulic water well rig. It is also necessary to pay close attention to the subsequent working conditions of the casing, to know the specific conditions of the drilling in time, to clean the drilling holes in time, and to drill the drill bit on the water drilling rig. Strong lifting is prohibited during this process.

3. There will be more residue at the bottom of the hydraulic well rig. The eccentric drill bit will be stuck by the slag and affect its collection and production. At this point, it is necessary to deliver compressed air and clean the holes again. And let the down-the-hole hammer work for a short time, the water well rig model, and then re-do the center drill lifting work.

602J


Inquiry