Depth600m Hydraulic Water Well Drilling Rig Machine

Depth600m Hydraulic Water Well Drilling Rig Machine

Product introduction: BZCY600CHW water well drilling machines is truck-mounted rotary drilling rig. The drilling rig adopts the chassis of SINOTRUK 8x4 special vehicle. Product parameters: swivel The swivel is the equipment of rotary system, and it is also a component of the water cycle system....

Product Details

Product introduction:

BZCY600CHW water well drilling machines is truck-mounted rotary drilling rig. The drilling rig adopts the chassis of SINOTRUK 8x4 special vehicle.

Product parameters:

Parameter

Drill depth

600(m)

Drill rod

89mm (3-1/2”)

Winch capacity

Main hook lifting capacity (kN)

300

Tool winch lifting capacity(kN)

20

Max- rope speed of main winch(m/min)

70

Max- rope speed of tool winch(m/min)

30

Hydraulic cylinder

Lifting capacity(20Mpa)(kN)

245

Feeding capacity(10Mpa)(kN)

59

Rotary table

Inner diameter (mm)

500

Rotate speed (rpm)

96;76;44;24;12

Max-torque(kN.m)

35

Mast

Height(mm)

11800

Rated load(t)

36

Drill tool

Kelly(mm)

108*108*7500

Drill rod(mm)

89*6000

Mud pump

Displacement1000L/min

Pressure 5 Mpa

Diesel engine

Cummins 6BT5.9-C180

132KW/2200rpm

Transportation size

长L)*(W)*(H) (mm)

13000*2500*4200

swivel

The swivel is the equipment of rotary system, and it is also a component of the water cycle system. It is under the swimming pulley, and it is connected with the high-pressure hose and main drill pipe/kelly. The V-shape seal ring and the core tube are the wearing parts. When the rig is working, it is usually to check the swivel, see if it works well. If it leaks mud, adjust the locking nut on the tap. If it can not be resolved, The V-shape seal ring and core pipe should be replaced.

Industry

1. Drilling water wells

2. Industrial production water supply

3. Mine ventilation holes, Precipitation hole

4. Oil exploration

5. Drilling geothermal wells

6. Road construction pile foundation

7. Geological explorations

8. Hydrogeological exploration

9. Road construction

10. Underground tunnel exploration

604Drilling system

1. Power system, equipment that provides energy for a complete set of rigs;

2. Working system, equipment that works according to the requirements of the process;

3. Transmission system, equipment for transmitting, conveying and distributing energy to the working unit;

4. Control system, control each system and equipment, coordinate and accurately work according to the requirements of the process;

5. Auxiliary system, equipment that assists the main system to work

Points for attention of using the truck mounted drilling rig

1. Clean the outside of the drilling rig, and pay attention to the cleaning and excellent smoothness of the base slide way and the vertical shaft of the drilling rig.

2. Check whether all the exposed bolts, nuts, secure pins, etc. are firm and reliable.

3. Add smooth oil or grease according to the requirement of smoothness.

4. Check the oil surface position of gearbox, transfer box and oil tank of hydraulic system.

5. Check the oil spill situation everywhere and solve it according to the situation.

6. Handle the problems that occurred before the well drilling rig and open it after confirmation.

603


Inquiry