Product introduction:
BZCY600CHW water well drilling machines is truck-mounted rotary drilling rig. The drilling rig adopts the chassis of SINOTRUK 8x4 special vehicle.
Product parameters:
Parameter | ||
Drill depth | 600(m) | |
Drill rod | 89mm (3-1/2”) | |
Winch capacity | Main hook lifting capacity (kN) | 300 |
Tool winch lifting capacity(kN) | 20 | |
Max- rope speed of main winch(m/min) | 70 | |
Max- rope speed of tool winch(m/min) | 30 | |
Hydraulic cylinder | Lifting capacity(20Mpa)(kN) | 245 |
Feeding capacity(10Mpa)(kN) | 59 | |
Rotary table | Inner diameter (mm) | 500 |
Rotate speed (rpm) | 96;76;44;24;12 | |
Max-torque(kN.m) | 35 | |
Mast | Height(mm) | 11800 |
Rated load(t) | 36 | |
Drill tool | Kelly(mm) | 108*108*7500 |
Drill rod(mm) | 89*6000 | |
Mud pump | Displacement1000L/min | Pressure 5 Mpa |
Diesel engine | Cummins 6BT5.9-C180 | 132KW/2200rpm |
Transportation size | 长L)*(W)*(H) (mm) | 13000*2500*4200 |
swivel
The swivel is the equipment of rotary system, and it is also a component of the water cycle system. It is under the swimming pulley, and it is connected with the high-pressure hose and main drill pipe/kelly. The V-shape seal ring and the core tube are the wearing parts. When the rig is working, it is usually to check the swivel, see if it works well. If it leaks mud, adjust the locking nut on the tap. If it can not be resolved, The V-shape seal ring and core pipe should be replaced.
Industry
1. Drilling water wells
2. Industrial production water supply
3. Mine ventilation holes, Precipitation hole
4. Oil exploration
5. Drilling geothermal wells
6. Road construction pile foundation
7. Geological explorations
8. Hydrogeological exploration
9. Road construction
10. Underground tunnel exploration
Drilling system
1. Power system, equipment that provides energy for a complete set of rigs;
2. Working system, equipment that works according to the requirements of the process;
3. Transmission system, equipment for transmitting, conveying and distributing energy to the working unit;
4. Control system, control each system and equipment, coordinate and accurately work according to the requirements of the process;
5. Auxiliary system, equipment that assists the main system to work
Points for attention of using the truck mounted drilling rig
1. Clean the outside of the drilling rig, and pay attention to the cleaning and excellent smoothness of the base slide way and the vertical shaft of the drilling rig.
2. Check whether all the exposed bolts, nuts, secure pins, etc. are firm and reliable.
3. Add smooth oil or grease according to the requirement of smoothness.
4. Check the oil surface position of gearbox, transfer box and oil tank of hydraulic system.
5. Check the oil spill situation everywhere and solve it according to the situation.
6. Handle the problems that occurred before the well drilling rig and open it after confirmation.