Product introduction:
BZCY600BZY hydraulic well drilling rig is direct rotary drilling rig. The truck chassis uses SINOTRUK brand 8×4 special chassis, 11.00R20 steel off-road tire tread, with good off-road performance.
Product parameters:
Technical parameter | |||
Drilling depth(M) | 600 | ||
Drilling diameter(mm) | 500 | ||
Inner diameter of the rotary table(mm) | 500 | ||
Speed of turntable(r/min) | 117;102;60;38;23;13;16(reverse) | ||
Torque of turntable(KN.m) | 5.4---34(reverse) | ||
Single rope lifting capacity of main windlass(KN) | 50 | ||
The capacity of main windlass(KN) | 300 | ||
Single rope lifting capacity of tool windlass(KN) | 20 | ||
The rope capacity of tool windlass(m) | 40 | ||
The lifting capacity of hook(KN) | 320 | ||
Bearing capacity of mast (KN) | 360 | ||
The effective height of mast (mm) | 11800 | ||
The height of mast (mm) | 12468 | ||
Bearing capacity (t) | 36 | ||
Pipe | Kelly (mm) | 108×108×7500 | |
Assistant pipe (mm) | Ф89×10×6000 | ||
Hydraulic pump | Model | CBQL-F550/F532-CFHL | |
Pump delivery (ml/r) | 50/32 | ||
Rated speed (r/min) | 2000 | ||
Rated pressure(MPa) | 20 | ||
3NB-130 | Diameter of cylinder (mm) | 100 110 120 130 140 | |
Stroke of piston (mm) | 160 | ||
Theory of flow (L / min) | 1000 | ||
Rated pressure (Mpa) | 5 | ||
Pounding times (min-1) | 135 | ||
Diameter of suction tube (mm) | 152 | ||
Diameter of drain pipe (mm) | 65 | ||
Input speed (r / min) | 565 | ||
Input power (kw) | 95 | ||
Overall dimensions (mm) | 2160*1400*1300 | ||
Weight (t) | 3.9 | ||
Truck chassis | Model | TAZ5204TYT | |
Drive form | 8×4 | ||
Engine | Model | SINOTRUK D10.27-40diesel engine | |
Rated power(KW) | 196 | ||
Speed (r/min) | 2200 | ||
Size (L*W*H)(mm) | 11510×2480×2800 | ||
Drilling rig engine | Type | CUMMINS 6BTA5.9-C180 diesel engine | |
Power(kw) | 132 | ||
Speed(r/min) | 2200 | ||
Electric generator | Model | MF | |
Rated power (kw) | 30 | ||
Rated voltage(v) | 380 | ||
Rated current(A) | 27 | ||
Speed (r/min) | 1480 | ||
Frequency(Hz) | 50 | ||
Protection level | IP21 | ||
Insulation Class | H | ||
The best working gear (or speed) | 5th gear(1000-1400r/min) | ||
The highest speed(Km/h) | 70 | ||
Weight (kg) | 21650 | ||
Transport size(L*W*H)(mm) | 12720×2490×4210 | ||
Working size(L*W*H)(mm) | 11830×5370× |
Installation of the unit:
1. Prepare the rock drilling space. The size of the space can be determined according to the type of chiseling and the method of chiseling.
2. Lead the gas and water (when water is required to remove dust) pipelines and lighting lines to the working point for use.
3. According to the design of the hole position, ensure the reliable positioning of the drilling rig. (with installation site map)
Second, the inspection before the operation:
1. When starting work, carefully check whether the pipelines are tightly connected to gas and water (when water is required for dust removal), especially the connection between the wind pipe joint and the wind pipe must be firm to prevent tripping and injury, and the joints are not allowed. There is a leak and water leakage.
2. Check if the oil mist is filled with oil (not too full).
3. Check whether the screws, nuts, joints, etc. of each part are tightened, and whether the various positioning is firm and reliable.