BZC600CHW truck-mounted water well drilling rig is truck-mounted rotary drilling rig. The drilling rig adopts the chassis of SINOTUCK HOWO 6X6 or 8x4 special vehicle. The diesel engine, double hydraulic winches,mud pump, rotary table,mast, kelly are all installed on the chassis. It equipped with independent 132KW/2200rpm diesel engine for drilling and install generator set (MF) to provide night lighting or welding maintenance at the construction site . According to the local geological conditions, BZC600CHW drilling rig can drill with mud , DTH hammer, air foam and hydro-hammer. It is highly adaptable to the stratum structure and can be used for drilling in clay, sand, highly weathered rock, bedrock, basalt and other strata.
Parameter | ||
Drill depth | 600(m) | |
Drill rod | 89mm(3-1/2”) | |
Winch capacity | Main hook lifting capacity (kN) | 300 |
Auxiliary hook lifting capacity(kN | 200 | |
Max- rope speed of main winch(m/min) | 60 | |
Max- rope speed of auxiliary winch(m/min) | 60 | |
Rotary table | Inner diameter (mm) | 500 |
Rotate speed (rpm) | 96;76;44;24;12 | |
Max-torque(kN.m) | 35 | |
Mast | Height(mm) | 15255 |
Rated load(t) | 36 | |
Drill tool | Kelly(mm) | 108*108*10500 |
Drill rod(mm) | 89*9000 | |
Mud pump | Displacement 1000L/min | Pressure 5Mpa |
Diesel engine | Cummins 6BT5.9-C180 | 132KW/2200rpm |
Transportation size | L*W*H (mm) | 16500*2500*4200 |
After sales service
◎Free warranty service and lifetime tracking service: Provide warranty service and lifetime tracking service according to after-sales service commitment, free maintenance during the warranty period, free replacement parts.
◎According to the customer's experience and geological conditions, we provide strategic choices for Binzhou rig models, provide intimate staff services for each user, and act as a good assistant for your investment.
◎Provide personalized service according to the special requirements of customers, provide drilling technology consulting services for complex geological conditions, freely train technicians for users, and provide extended services beyond key engineering information and operator training.
Main functions of drilling:
1. Obtain underground physical data and obtain core, cuttings, oil, water, natural gas, etc. from the bottom of the well.
2. As a geophysical logging channel, obtain data on various geophysical fields of the rock formation, such as underground military fire tests.
3. As an artificial channel, observe the mineral, hydrological and geological structures in the stratum.
4. Comprehensive application, comprehensive exploration and acquisition, and the use of underground resources.
Hot Tags: mobile rotary water borehole drilling machine, China, manufacturers, suppliers, factory, price, cheap, for sale
The rig should be checked at any time
1. Check the consolidation of the wire rope end;
The contents of the wire rope inspection are: the number of safety rings of the wire rope, the selection, installation and lubrication of the wire rope, the defect inspection of the wire rope, such as the diameter and wear of the wire rope, the number of broken wires of the wire rope, etc.;
2. Check the pulley system of the drilling machine at any time. The main inspection items are: the condition of the pulley body and the anti-jumping device of the transition pulley;
3. Check the walking system of the drilling rig at any time. The main inspection items are: the condition of the pile machine, the card board and the hook pipe system, and the laying of the sleeper;
Third, do a good job of rig maintenance and repair records, the replacement parts should have a detailed record to ensure that the spare parts are used within the validity period, or keep abreast of the time of the next replacement;
4. If the rig is faulty, stop the operation immediately and do not use it until the fault is not eliminated.
Matters Attention
1. If the tools are locked in the hole, it must act the tools up an down. When the tools are loosed, and then lift the tools.
2. When complete the drilling, it must lift out the tools and put them to the safe place, it will prevent burying the tools.
3..Adjusted according to different strata of the viscosity of drilling mud, and select the appropriate bit or other drilling method used.
4. It is strictly prohibited to make the rig be in the long-term overloading situation.
5.Can not bump the screw thread of drill pipe when carry them, take protective measures. When use the dill pipe, please clean the screw thread and smear grease.
6. The compression device using the wire rope is used only mild pressure in the hard layer.(And the pressure is less than 1 ton) It must not be forced, otherwise the bored will easily tilt. So it is recommended to use drill collar to press.