Tanzania Truck Mounted Water Well Drilling Equipment

Tanzania Truck Mounted Water Well Drilling Equipment

BZCDF150SDF truck mounted hydraulic drill rigs is our self-dependent innovation product. It is top head drive drilling rig. It adopts DONGFENG TRUCK 4x2 special truck chassis and the generator, hydraulic system, electronic control system, 6BS gravel pump, drill tower are on the chassis.

Product Details

Product introduction:

BZCDF150SDF truck mounted hydraulic drill rigs is our self-dependent innovation product. It is top head drive drilling rig. It adopts DONGFENG TRUCK 4x2 special truck chassis and the generator, hydraulic system, electronic control system, 6BS gravel pump, drill tower are on the chassis.

Product parameters:

Technical parameter

Max-Drill depth(m)

150

Drill diameter(mm)

450 --- 2000

Top head speed(r/min)

22

Top head torque(kN.m)

7.5

Single line pull force of minor winch(t)

3

Tower height(mm)

6980

Bearing (t)

20

Drill pipe(mm)

Ф168×6×2000

6BS gravel pump

theoretical flow(L/min)

200

Input power(kw)

30

vacuum pump

Max-displacement(L/min)

4.66

Input power((kw)

7.5


Engine


Diesel engine

model

YC6J160-33

Rated power(KW)

132

speed(r/min)

2500

Drive form of chassis

4x2


Diesel Generator set

Rated power(kW)

100

Rated voltage (V)

400

frequency (Hz)

50

Walking speed(km/h)

75

Transport dimension (L×W×H)(mm)

9620*2480*3920

Working dimension (L×W×H)(mm)

8680*4560*8630

150sdf1

How to improve the production efficiency of hydraulic water drilling rigs?

1. After the drill bit of the hydraulic water well drilling rig is drilled into the structure, the center drilling tool needs to be replaced in time. First, you need to clean the bottom of the hole and then blow off the residue at the bottom of the hole. After the drill bit stops rotating, the drill bit in the hydraulic water well drilling rig is drilled. It is most suitable when the lifting force is slowly increased and the lifting force is just enough to lift the drill bit.

2. The drilling process summarizes the drill bits of the hydraulic water well rig. It is also necessary to pay close attention to the subsequent working conditions of the casing, to know the specific conditions of the drilling in time, to clean the drilling holes in time, and to drill the drill bit on the water drilling rig. Strong lifting is prohibited during this process.

3. There will be more residue at the bottom of the hydraulic well rig. The eccentric drill bit will be stuck by the slag and affect its collection and production. At this point, it is necessary to deliver compressed air and clean the holes again. And let the down-the-hole hammer work for a short time, the water well rig model, and then re-do the center drill lifting work.

About Requirements for ordering services

With over 66 years of continuous experience building water well drilling rigs, BINZUAN rig is able to provide each customer with a rig custom tailored to his or her precise needs.Because many BINZUAN rigs have their own power source, rigs can be mounted to a customer's existing truck at our facility or we can ship the rig in skid form to the customer who can mount the rig to his existing truck or equipment.Complete engineering and technical support is provided by BINZUAN rig.

Every truck mounted well drilling machines is engineered with our customers' needs in mind. Requests and suggestions from our customers for special features and drilling configurations have been incorporated into our entire product line.

Combined with truck mounted well drilling machines craftsmanship, these innovations have helped BINZUAN rig produce a line of rigs that is unsurpassed in the industry for versatility and efficiency.


Inquiry