Details of the preparation of the well drilling rig before the construction

- May 26, 2019-

  Well drilling rig production needs to be prepared, lay a good foundation work to ensure the stable and efficient production of well drilling rig. The production preparation of the well drilling rig is divided into several steps, respectively: the location, repair of the highway, flat well site, foundation, installation and so on.

  These preparations are not only necessary, but also necessary for production operations.

  The main role of the flat well site is to level a site around the wellhead, so that the well drilling rig better construction production, for the size of the well site area is the size of the well drilling rig, large well drilling rig needs a larger site, smaller well drilling rig needs a smaller site. The function of the position is to determine the position of the well drill well body axis or bottom of the well according to the geological or production demand. Laying the foundation is to allow the better production of well drilling rigs, in order to ensure that the well drilling rig construction process does not appear all kinds of noise, it is more necessary to lay a good production base to ensure the safety and stability of production, installation is for the well drilling rig needs to stand bid, installation of well drilling rig drilling equipment.